Our concrete floors are everlasting - they don't crumble, crack or decay over time.
Able to handle both heavy pay-loader traffic and prolonged exposure to grain, this is the last floor you'll ever need. Surface can be finished anywhere between rough to extra smooth.
T.G. Corver & Sons, subcontracted to the main contractor Esor, did all concrete works on the BG3 Pipeline Project from 2011-2013.